概要:6.3 Within twenty-four hours after the despatch of each lot of the technical documente,Party B shal1 notify Party A by cable or telex of the contract number, number and dateof the air consignment note, items of the documents, number of pieces, airmail toParty A two copies of each of the air consignment note and detaikled list of thetechnical documents.6.4 If the technical documents are foumd lost, damaged or mutilated during airtrans-portation, Party B sha
国际专利许可合同(附英文),标签:法律文书写作,法律文书大全,http://www.laixuea.com6.3 Within twenty-four hours after the despatch of each lot of the technical documente,
Party B shal1 notify Party A by cable or telex of the contract number, number and date
of the air consignment note, items of the documents, number of pieces, airmail to
Party A two copies of each of the air consignment note and detaikled list of the
technical documents.
6.4 If the technical documents are foumd lost, damaged or mutilated during air
trans-portation, Party B shall supply Party A free of charge with a second lot of
documents within thechortest possible time but not later than thirty days after it has
received from Party A the writtennotice. Within sixty days after party a has received
the documents from Party B,if Party A does not declare the shortage and request to
cover the same, it is considered asa-cepted.
6.5 The technical documents shall be in English and based on metric system of
measure-ments.
Article 7 Verification and Acceptance
7.1 The Verification Test on the first samplemachine of the Contracted Product shall
be carried out by the joint group consisting of Party A’s and Party B’s representatives
accordingto the schedule and contents stipulated in Appendix 7 to the Contract. lf the
performance of the Contracted Product is in conformity with the technical specifications
stipulated in Ap-pendix 1, such testshall be considersd as qualified and the
representatives of both parties shll sign the Inspection and Testing Certificate for the
proper performance of the Contracted Product in quadruplicate, 2copies for each party.
7.2 If the Verification Test demonstrates that the performance of the Contracted
Prod-uct isnot in conformity with prescribed technical specifications, both parties
shall, throughamicable negotiations,make a joint study of and analyse the cause and
take measures to e-liminate the defects and carry out asecond test. when the second test
demonstuates tha the performance is qualified, both parties shall sign a testing
certificate for the proper perfot- mance
7.3 If Party B is responsible for the failure of the first test, Party B shall send